Main services: directional drilling of non-excavation construction, pipe jacking machine construction
position:home >> Project
Project performance

Gas Transmission Pipe Line HDD Gan river crossing Project

\
West-to-East Gas Transmission Pipe Line HDD Gan river crossing Project
Material:Iron pipeline Φ1219mm   Length:1371m
Machine:GD5000-LL Crawler type large HDD rig
Copyright © 2008-2016 All rights reserved. All rights reserved. 2008-2012
Address: No.6 Jinhao Road, Xinhua Industrial Park, Dezhou City, Shandong Province
Tel: (086)534-2356873 (086)2356031(fax) Tel: (086)13905344870